Coordination drawings, also referred to as composite in some cases, are critical to the fruitful construction of a building whether it is institutional or commercial. Essentially, co-ordination involves avoidance of physical strife in the preparation of the materials in a building. Again, it encompasses procedures of duct piping as well as other systems in the building. In building projects that have numerous mechanical, plumbing and electrical needs, this risk is outstanding. Therefore, it is imperative to involve MEP coordination drawings at a site.

Basically, MEP refers to Mechanical, Electrical, and Plumbing. Therefore, these drawings are used so as to reduce problems between the various trades. For example, if there are subcontractors dealing with each other. The skillful drawings act as a major planning tool that enables smooth installation of each equipment.

These drawings are often made after every routine and elevation has been established. For example, an HVAC system, electrical, plumbing, as well as fire protection, piping together with other systems, and are laid out all as one. After completion and meeting approval, subcontractors can then design their detailed drawings based on the specific area they deal with.

If one recruits an effective firm that is efficient in this process, they are able to save a lot of time spent in the construction hence save a lot of money and make profits. This is crucial as very many construction sites tend to make more loss than profits. However, the quality of the drawings are different and varying from one coordination firm to another. Hiring non-professionals to save money tends to be costly as more problems emerge as the process progresses. This tends to delay the project and create more confusion.

For a company to be competent, it is crucial for them to be attentive to information that involves the MEP coordination tools. Firstly, there is a design knowledge, which is usually practiced to ensure that a project meets all the required standard and codes. The detailers and drawing engineers are usually consulted on this. This entails configuration, location and regulating property.

At the same time, there is construction knowledge in this tools that helps to guarantee efficient field operations, as well as building feasibility. This tools have knowledge on the access requirement, construction method, safety, and configuration. At this point, engineers and the foremen usually provide the knowledge.

The major areas involved in the MEP process are the most important structures in building. For example, the HVAC system consists of air handling, automatic monitory systems and cooling systems. It assists in making sure that air is conditioned throughout. The fire protection yet another system that helps make buildings quick in warning people of fire as well as fire resistant.

The other areas are such as the electrical systems that involve supplying, distribution, and lighting. Plumbing system is another area that focuses on the pressure driven systems and pumped waste among many other. Finally, there is the piping system and the telephone or datacom. Therefore, there is the need for the MEP coordination in the buildings to ensure there are no damages or extra costs.