Before the construction of a pipeline for the sewage system, it is crucial to check on what has been adopted in other areas where the project has already being completed. Not only will ideas on the construction be obtained but also options on pipeline maintenance and inspection.

Areas which are densely populated need very efficient pipelines. However, there is no need to adopt complicated plans if the area being worked on is only habited by a few people. Formal guidelines are needed in such a situation. The needs in a particular area should be reviewed for a better plan.

Scenarios which can result to a failure of the system should be reviewed. It will be easier to put in place measures to prevent them when they are already known. However, it is good to be prepared for the worst. Even with adequate preventive measures, emergencies can still come up. There should be a means to respond to such within the shortest time possible.

The maintenance program has to be proactive. A concrete schedule should be drafted outlining the servicing of the system. Details on the procedures to be followed in executing the tasks are needed too. The person who is offering the services should be selected after careful consideration so that he or she will not fail. Do not expect to be given a plan that is perfect. It is the prevailing conditions and circumstances in the area of interest that will control the proceedings.

The cost does not have to be exaggerated. The burden will be pushed back to the average citizen. Most of the people who are struggling to fed for their families and the last thing they need is someone to increase their burden. It would be better if the taxes are reviewed downwards instead of upwards.

A full report need be given after inspection and be reviewed by the relevant board. Every detail has to be focused on so that problems can be detected in good time and measures taken to deal with them. Repairs and replacements are costly when the damage is wide spread. It should not come to this when there is a way to prevent such.

There must be transparency in the system too. All procurement processes should be done following protocol and any member of the state can request for the documents. They must be in order all the time. There are people who enjoy using what they have not worked for. When there is accountability and transparency then they will not have the opportunity to benefit from the hard work of their colleagues.

When the resources are not adequate, some steps will be skipped and the outcome will not be great. Therefore, the involved authorities ought to ensure that the contractor carrying out the activities has been provided with all that he or she needs in order to get the job done. Besides the resources, they should be given peace of mind so that they can concentrate entirely on the task at hand.